The plinth part of the throttle

Wednesday, August 17, 2011 fine

I am summer vacation from the 13th.
Several recent weeks were very busy with both public and private matters. The thing with which the goodness is embarrassed leaks water the solar heating system of the house, and has spent considerable time and energy on the restoration. In such a translation, the cockpit doesn't progress so much either. The throttle was constructed after a long time in the hut today. The plinth part of the throttle was completed.

A sultry day

Monday, July 18, 2011 fine

A sultry day continues every day.
I kept making cockpit in hut.
When internal wiring of the throttle was checked,
trouble was found by as much as two places.
It resolved, microswitches were exchanged,
and the part where wiring had been disconnected was repaired.
In addition, the spacer was placed and each rib interval was
fixed firmly. Wiring is considerably crowded each other.